Malé (MLE) Traffic ‘Down 100%’ on 27 November 2026 — a Receiver-Coverage Gap, Not a Closure
Our receiver feed recorded zero movements at Velana International on 27 November after five covered days of 327–463. The far ends of Malé’s flights were still recorded; weather was ordinary and no closure notice is on file.
- The −100% is a gap in our receiver coverage, not a measured shutdown: flights on Malé’s routes were still recorded at their other ends on 27 November.
- Our feed has covered Malé for five full days (22–26 November, 327–463 movements a day) — every count is a floor, not a total.
- No aerodrome-closure notice is in the NOTAM set we hold (refreshed 26 November) and the weather on 27 November was ordinary for the season. Check your airline for the status of a specific flight.
Status notes and update log — data as of 28 Nov 2026, 03:55 UTC
Status. MEASUREMENT GAP. Malé (VRMM) entered our receiver feed at 11:34 UTC on 21 November; 22–26 November read 327–463 movements a day (26 November after two ingest passes). The last Malé record is at 16:41 UTC on 26 November, and 27 November is zero after one ingest pass — at every Maldives airport, while the network-wide pass was normal (98,944 departures) and 60 callsigns from Malé’s non-domestic legs were recorded at their far ends. METAR 27 November: 21 reports, visibility 6 km or better, wind 11 kt or less, showers and thunderstorms nearby. NOTAM set for VRMF last refreshed 26 November 05:03 UTC: two notices in force, neither closes the aerodrome. No airspace-closure event for VRMF in our detection layer. No second ADS-B aggregate holds Malé records. Next check: 27 November after its second and third ingest passes; close when a full UTC day returns inside 327–463, or close as a no-recovery gap if coverage does not return.
- 2026-11-28 03:55 UTC — First publication: 27 November reads zero at Malé after one ingest pass; the record stops at 16:41 UTC on 26 November across the Maldives while far ends of Malé flights were still recorded.
Advisory timeline — how active is this episode
Malé is new to our feed: from August to 20 November the crowdsourced receiver network logged between zero and four movements a day there, which is no coverage at all. Records started at 11:34 UTC on 21 November and for the next five full days read like a working airport — 463, 327, 406, 327 and 382 movements (22–26 November), with departures and arrivals close to even. The last Malé record is at 16:41 UTC on 26 November; 27 November has none in any hour. Daily counts:
Fig. 1 — Observed departures + arrivals at Malé (VRMM) per UTC day, recounted from raw flight records; 21 Nov is a part day (first record 11:34 UTC), 26 Nov is after two ingest passes, 27 Nov after one · * partial day · Data as of 28 Nov 2026, 03:55 UTC · Source: Observed movement records for VRMM from a crowdsourced ADS-B receiver network, as collected by FlySafe monitoring.
Airports in the exposure zone
| Airport | Size | Distance from MLE | FIR |
|---|---|---|---|
| Velana International Airport (MLE) | large | 0 km · no records after 16:41 UTC 26 Nov | VRMF |
| Maafaru International Airport (NMF) | medium | 180 km · no Maldives records 27 Nov | VRMF |
| Hanimaadhoo International Airport (HAQ) | medium | 285 km · no Maldives records 27 Nov | VRMF |
| Gan International Airport (GAN) | medium | 542 km · no Maldives records 27 Nov | VRMF |
Per-airport readings — 1 airport
- MLE — Covered in our feed from 11:34 UTC 21 Nov; 22–26 Nov 327–463 movements a day; 27 Nov zero after one ingest pass.
Distance alone does not determine impact — wind direction and the flight levels the ash reaches decide which airports and routes are affected on a given day. FIR = Flight Information Region.
What it means for flights
A zero is a statement about our receivers first. Crowdsourced ADS-B counts depend on volunteer receivers within line of sight of the runway. Malé sits on a small island chain with few such receivers, which is why our feed logged almost nothing there until 21 November. When one or two receivers carry an entire country, a single one going offline erases the record for every airport they cover at once — exactly the Maldives-wide blank seen on 27 November.
How a real stoppage would look different. A weather or operational stoppage thins a record unevenly and leaves a trickle of movements, and it usually comes with a closure NOTAM, severe weather in the METAR, or both. On 27 November Malé’s weather reports kept coming through the day (visibility 6 km or better, wind 11 kt or less, showers and thunderstorms nearby), no aerodrome-closure notice is in the set we hold, and flights tied to Malé were still recorded departing from or arriving at their other airports.
What we cannot say. We cannot tell you how many flights operated at Malé on 27 November: the far-end records show that a set of Malé flights flew, not that the schedule ran in full. Our NOTAM set for the Malé FIR (VRMF) was last refreshed at 05:03 UTC on 26 November, so a notice issued after that would not be in it. The status of any specific flight is a question for the airline.
What would close this page. A full UTC day of Malé records back inside the 327–463 range of 22–26 November closes it as a coverage gap that ended. If coverage does not return, we will close it as a gap with no recovery reading and say so; either way, the automated multi-signal analysis behind this page keeps watching the FIR for closure notices and airspace signals.
Passenger questions, answered from the data
Our data does not show a closure. The zero in our feed comes from lost receiver coverage: flights on Malé’s routes were still recorded at their other ends, weather reports ran normally, and no aerodrome-closure notice is in the NOTAM set we hold (refreshed 26 November 05:03 UTC). Check your airline for a specific flight.
Our counts come from a crowdsourced ADS-B receiver network. Malé had almost no coverage until 21 November; from 16:41 UTC on 26 November the records stopped again for every Maldives airport, while the rest of the network kept reporting. A zero here means we stopped seeing Malé, not that we saw an empty airport.
We do not issue safety verdicts. We publish what our data measures — here, a gap in receiver coverage with no closure notice and ordinary weather on file. Go/no-go decisions belong to airlines and the Maldives aviation authorities.
For media — the full kit
Everything on this page — charts, CSV, quotes — is published under CC BY 4.0: free to reuse with attribution to FlySafe.zone. Charts come in dark (social/web) and light (print/light layouts) versions; attribution and license are embedded in every file.
“Observed traffic at Malé’s Velana International fell to zero in FlySafe’s receiver feed on 27 November after five days of 327–463 movements, but flights on Malé’s routes were still recorded at their other ends and no closure notice was on file — a gap in receiver coverage, not a closure, according to flight-monitoring service FlySafe.zone.”
Boilerplate — about the source (for your article footer)
FlySafe.zone monitors airspace risk and observed airport activity worldwide: 334 flight-information regions scored daily, GPS-interference signals, volcanic-ash exposure and daily observed movements at 493 airports from the crowdsourced ADS-B receiver network. Methodology: flysafe.zone/methodology.
Need a different cut of the data, a comment, or numbers for another airport? Leave an email — we answer fast during active events.
